944 Falconbridge Road · Greater Sudbury

A 52-unit rental building, zoning approved and ready to build.

$600K+ already spent clearing the risks. Government incentives landed after, as bonus value.

52

Units

5

Storeys

Rezoned

100% HST rebate50% off development chargesVacancy ~1.1%City-funded sewer capacity upgrade

Project visuals

See the site, layouts, and concept renderings in under a minute

The building is not constructed yet. Images labeled “concept” show what the project can look like when a developer builds it, alongside current-site context and floor layouts.

Why this project stands out

Approvals, policy, and demand all line up in a rental market with very little supply.

Risks cleared, incentives stacked

Rezoning approved. Utilities confirmed. A full HST rebate and 50% off development charges on top. The incentives arrived after we started, so the savings are a bonus.

Tight market, steady demand

Sudbury vacancy is ~1.1%. Immigration, hospital expansion, and mining jobs keep rental demand high while new supply stays limited.

Strong location

Minutes to multiple active mine sites, the hospital, schools, and government offices. Main-road frontage with transit at the door, in an area the City wants to grow.

Skin in the game

$600K+ already invested in the project

The approval and technical work has been paid for with real money, not promises. A new partner inherits the finished work, not the risk.

Money spent so far

$600K+

Paid to get the project ready to build

  • Land purchaseHard cost
  • Legal costsPaid
  • Architect and planning feesPaid
  • Soil testing (drilling and lab work)Paid
  • Civil engineering and drainage designPaid
  • City application feesPaid
  • Rezoning to a 5-storey, 52-unit rentalCompleted

Approvals in hand

10 complete

The paperwork is already done

  • Rezoning approved
  • Official Plan alignment confirmed
  • Planning Justification Report accepted
  • Soil (geotechnical) report complete
  • Noise study complete
  • Civil engineering advanced
  • Architectural concept design complete
  • City utility upgrade tendered and underway
  • Site Plan Approval in final stage
  • Unit sizes and mix finalized

The costly risks are already handled

Due diligence has been advanced to identify, document, and address major risks, and the project is ready to move toward Site Plan Approval.

Land

Cleared

Bought as vacant land. Clean title, no debts against it, no known environmental issues.

Planning

Cleared

Rezoning approved by the Planning Committee. City policy alignment and planning report accepted.

Political

Cleared

Community pushback during rezoning was answered on the planning facts. Committee approved unanimously.

Technical

Mostly cleared

Soil test done and foundation defined. Noise study shows nothing extra needed. Civil work advanced.

Utilities

Cleared

Sewer capacity issue flagged early. The City is now paying for and running the upgrade work.

How we got here

Years of careful investment and planning

This project has already seen years of progress that help it move forward faster than many raw development sites. Money was spent only as each approval was won. Every milestone unlocked the next round of work, putting the next buyer much closer to Site Plan Approval and a building permit.

Concept visualization timelapse
  1. Purchase

    Vacant land bought, originally zoned for a 1-storey office.

  2. Planning

    Early talks with the City confirmed the project fits local policy.

  3. Approvals

    Rezoning application filed and moved through the public review.

  4. Approvals

    Community pushback addressed with planning facts.

  5. Technical

    Noise study complete. No extra soundproofing required.

  6. Technical

    Soil test complete. Foundation design locked in.

  7. Technical

    Civil design advanced, including drainage.

  8. Utilities

    Sewer upgrade flagged early. Servicing upgrades are tendered and construction is underway.

  9. Approvals

    Planning Committee approved the rezoning.

  10. Next step

    Engineering firm hired to finish Site Plan conditions.

Proof you can check

Don’t just take our word for it

The key claims on this page can be checked in City records and public policy announcements.

Public Record

Approved even after strong community pushback

Committee approved the project on its merits after active opposition. The planning risk is tested, not assumed.

Public Record

Sewer upgrade funded and underway

944 Falconbridge Road is named in the City record as a direct beneficiary. The utilities fix is on a funded timeline.

Policy Update

Full HST rebate on new rental buildings

Federal program removes GST and federal HST on qualifying rental construction. It applies directly to this building.

Policy Update

Development charges cut by up to 50%

Federal and provincial program, time-limited, backed by infrastructure funding to cities.

What’s left

Now it’s about building, not guessing

The uncertain parts are done. What’s left is getting it built, and it lands right when government support for new rentals is at its strongest.

Stage 1

Approvals are done

Early City talks, rezoning, and public approval are all finished, including a win over community pushback on the planning facts.

Stage 2

Most of the risk is behind us

Significant architectural and engineering work is advanced (soil, noise, civil, and concept architecture). Detailed design and studies may still expand as the build path firms up. The project sits at the last step before Site Plan Approval.

Stage 3

Government help is lowering the cost

Federal and provincial policy is actively cutting costs through a full HST rebate and 50% off development charges, aimed at projects that are already far along.

What’s left to do

Build phase

A short, clear list of remaining steps

  1. Lift the building hold

    Clears automatically once the City finishes the sewer upgrade.

    Approved
  2. Final Site Plan submission

    Engineering firm hired and working on the submission.

    In progress
  3. Building permit

    Issued after Site Plan approval and the hold is lifted.

    Next
  4. Construction financing

    Arranged by the builder or development partner.

    Partner step
  5. Start construction

    Shovels in the ground once the permit and financing are in place.

    Next

Due diligence

A complete institutional data room, on request

Comprehensive documentation is available for qualified parties upon execution of a standard NDA.

Qualified access · NDA required
  • Full Rezoning Package

  • Planning Committee Resolution

  • Geotechnical Report

  • Noise Impact Study

  • Architectural Drawings

  • Civil Coordination Documentation

  • Planning Justification Report

  • Capital Deployment Summary

  • Stormwater Management Design

Ready to dig in?

Request institutional access

Book a call. We'll confirm fit, send the NDA, and grant data room access to qualified parties.

Book a call to request access

Book a call

Pick a time — and get the 2026 Sudbury market report.

A short, developer-focused call on the approvals, 2026 incentives, and what’s driving Sudbury rentals. We'll email the PDF report to the address you book with.

Justin Muzzatti headshot

You'll be meeting with

Justin MuzzattiSales Representative

What you'll get

  • Walk the approvals, HST rebate, and 50% off development charges
  • See how $600K+ of pre-work de-risks underwriting
  • Receive the 2026 Sudbury rental market report (PDF) by email
  • Discuss fit, timing, and the 2026 savings window
Approved · 52 units100% HST rebate50% off DCs

For builders, developers, and institutional investors.

Times shown in your local timezone. You'll receive a calendar invite by email.

For future residents

A quiet corner of Sudbury, built to live well in

A new rental community in an established, well-connected area. Join the list for leasing updates.

Shops and nature close by

Minutes to New Sudbury Centre for shopping, food, and daily errands. Parks, trails, and Lake Wanapitei just down the road.

Easy to get around

Direct access to Falconbridge Road. Transit at the door to Garson, New Sudbury, and downtown.

Quiet, settled area

A calm, community-oriented neighbourhood that suits professionals, families, and people looking to downsize.

Neighbourhood at a glance

Walk, bike, and commute from 944 Falconbridge Rd

A snapshot of daily errands, nearby amenities, and travel times to downtown Greater Sudbury.

Walkability map of 944 Falconbridge Road, Greater Sudbury. Commute to downtown: 12 minutes by car, 27 minutes by bike, 60+ minutes on foot. Walk Score of 50 (somewhat walkable). Bike Score of 45 (somewhat bikeable).

Scores via Walk Score. Commute times reflect typical peak-hour travel.

Join the resident interest list

Be first to see floor plans, pricing, and move-in dates.

No spam. We only reach out with project updates and leasing information as the building progresses.